Chris Horrell

Vice President

 

Chris Horrell came on board with Durrell in 2001 after attending the University of Mississippi. He had a background in large scale installations with previous projects such as Kansas City Chiefs, Vanderbilt Memorial Gymnasium as well as several projects on the local level. Chris started as the Operations Manager overseeing the maintenance contracts as well as the operation of the Motor Sports Division of Durrell. His first duties as a Project Manager were to supervise the sound system installation of a WHJW design at the Kansas City Royals’ Kaufman Stadium in 2003.  Chris served as the Project Manager on later projects to include the design/install at Las Vegas Motor Speedway, the design/install at Atlanta Motor Speedway, the design/install at Bristol Motor Speedway, the acoustical install at the Indian Pacer’s Conseco Field House, the install at Cincinnati Bengal Paul Brown Stadium, the design/install at Cleveland Browns Stadium, and the design/install of the Bridgestone Center in Nashville, TN.